Documenting a job so a dispute never starts

What to photograph, what to keep, and why the contractor with the record almost always prevails.

Published Reviewed United States RCA staff 2 min read

When a complaint comes to this program, both sides describe the same job and the descriptions do not match. That is not usually dishonesty. People genuinely remember differently, months later, under stress.

The side with dated photographs and written approvals is in a different position from the side relying on memory. It is worth about an hour per job.

Before anything comes off

  • The whole roof from the ground, all elevations.
  • Any pre-existing damage: sagging, prior repairs, damaged fascia, gutter condition, previous flashing work.
  • The interior of anywhere there has been a leak, including existing stains.
  • The driveway, landscaping and the air-conditioning unit, so their condition before your crew arrived is not in question.

Pre-existing damage photographs are the ones contractors wish they had. A homeowner pointing at a cracked driveway after a dumpster has been there is very hard to answer without them.

During tear-off

  • The deck, once exposed, before new material goes on.
  • Every area of rot or damage you find, in context so the location is identifiable, before you replace it.
  • Flashings as found, particularly any you are reusing with the owner's agreement.
  • Ventilation as found, intake and exhaust.

During installation

  • Ice and water shield and underlayment down, before shingles.
  • Valley construction.
  • Each flashing detail completed.
  • Ridge and ventilation completed.
  • A few nailing-pattern shots. Manufacturers' warranty claims turn on this.

At completion

  • The finished roof from all elevations.
  • The site after cleanup, including the driveway and lawn.
  • Anything the owner pointed out during a walkthrough, and its resolution.

What to keep, and for how long

Keep for the length of your workmanship warranty plus your state's limitation period, which your counsel can tell you:

  • the signed contract and every change order, with evidence of approval;
  • all photographs, organised by job and dated;
  • material delivery tickets and the manufacturer's product documentation;
  • the permit and inspection records;
  • invoices and payment records;
  • every written exchange with the owner, including texts.

That last one does more work than people expect. Export and save the message thread at the end of the job. Phones get replaced.

A practice worth adopting

At the end of each job, send the owner a short closing message: what was done, any change orders and what they covered, the warranty terms and how to make a claim, and three or four of the completion photographs.

It takes ten minutes. It confirms the record while everyone agrees on it, it reads as professional, and when a complaint arrives eighteen months later you have a dated summary that the owner received and did not dispute at the time.

These are recommendations, not requirements. Following them is not a condition of membership and does not create a review result on your listing. Where a recommendation conflicts with a manufacturer's instructions, a building code or a jurisdiction's rules, those take precedence.

Find a contractor

Search the directory and see what the association has reviewed on each listing.

Search the directory

Check before you hire

We can confirm insurance, registration and complaint history on any roofing contractor.

Order a check